This single monitor arm fits most flat/curved screens 17 inches to 49 inches with a supporting weight of 2-15 kg (4.4 to 33 lbs) & patterns 100 x 100 mm and 75 x 75 mm Please check the compatibility before purchase.
Full Motion Design: This monitor arm features +45°/-45° tilt up and down, 180° swivel, 360° rotation and 13.7" height range for superb flexibility, allowing you to place screen in the best view or elevate your monitor to relieve neck and back strain and optimizes desk space.
Double Benefits: Double efficiency and productivity to make working or relaxing more comfortable. Open up available desk space can help to provide a new range of adaptable positions for your displays.
Pneumatic Monitor Arm: Pneumatic Monitor Arm: With great features like its gas spring mechanism and precision bearings, this monitor mount allows users to effortlessly adjust their monitor to their optimal ergonomic position while also providing top-to-bottom cable management.
Easy to Assemble: We provide all the necessary tools and hardware for easy assembly. The detachable mount with dual mount options. Desk required thicknesses for both C-clamp mount and grommet mount is 0.39" to 3.14".