Skip to main content
  • $37.49
  • Free 15-day Returns
Ships from China.
Sold by fadaoe
Top Rated
5 (5 seller ratings)

Shipped by fadaoe

Price alert
Shop it at NeweggBusiness.

Meet Your Seller

Bluetooth 5.0 Transmitter Receiver Wireless Adapter Low Latency 3.5mm AUX Jack Optical SPDIF Audio Adapter For PC TV Car Speaker

  • Smooth: Bluetooth enables you to wirelessly transfer your TV, PC/laptop or other favorite device to your headphones!With our unique two-in-one design, you can also use ZF380 as a receiver with Bluetooth capability to connect your favorite wired speakers, speakers, home theaters, etc.
  • Magic match: The Bluetooth transmitter receiver is compatible with 99% of the TV on the market, and our ZF380 supports fiber/AUX and RCA audio output without additional wire interference.
  • No latency:USES low latency technology to reduce Bluetooth latency - providing perfectly synchronized, high-quality sound.
  • LED indicator state: The indicator design allows you to clearly identify the content and connection mode, making it more convenient for you to use.Built-in 300mAh battery, charging about 1.5 hours can be as long as 7-8 hours of working time.
+
+
Overview
Specs
Reviews


Bluetooth 5.0 Transmitter Receiver Wireless Adapter Low Latency 3.5mm AUX Jack Optical SPDIF Audio Adapter For PC TV Car Speaker



Fearture: 

Smooth: Bluetooth enables you to wirelessly transfer your TV, PC/laptop or other favorite device to your headphones!With our unique two-in-one design, you can also use ZF380 as a receiver with Bluetooth capability to connect your favorite wired speakers, speakers, home theaters, etc.

Magic match: The Bluetooth transmitter receiver is compatible with 99% of the TV on the market, and our ZF380 supports fiber/AUX and RCA audio output without additional wire interference.

No latency:USES low latency technology to reduce Bluetooth latency - providing perfectly synchronized, high-quality sound.

LED indicator state: The indicator design allows you to clearly identify the content and connection mode, making it more convenient for you to use.Built-in 300mAh battery, charging about 1.5 hours can be as long as 7-8 hours of working time.



Specifications:

Product Name:Bluetooth Audio Receiver Tranmsitter

Output Jack: 3.5MM AUX+Optical

Model Number:ZF380

Protocol:AVRCP A2DP

Vesion:Bluetooth 5.0

Connect:Optical output/input,Smart 1 to 2

Distance:10M

Frequency:2.402Ghz-2.480Ghz

Size:60*60*20mm

Warranty & Returns

Warranty, Returns, And Additional Information

Warranty

  • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
  • CONTACT

Return Policies

  • Return for refund within: 15 days
  • Return for replacement within: 30 days
  • This item is covered by fadaoe Return Policy

Manufacturer Contact Info

LOADING...